General Plan and Zoning Code Update

14 Documents in Project

Summary

SCH Number
2003041105
Lead Agency
City of Anaheim
Document Title
General Plan and Zoning Code Update
Document Type
NOD - Notice of Determination
Received
Posted
9/26/2006
Present Land Use
Various
Document Description
The project applicant proposes to develop 339 attached for-sale condominiums on approximately 20.3 acres. A 14-foot sound wall is proposed along the eastern boundary line, separating the future residential uses from the Metrolink railroad. The proposed project includes the extension of Melrose and Kroeger Streets from Santa Ana and South Streets, and the extension of Water Street from Olive Street to the Metrolink railroad. The developer proposes to dedicate to the City 0.47 acre which would be used from a public neighborhood park. Additionally, a 0.95-acre private open space area, including a pool area and open lawn, is proposed toward the center of the site.

Contact Information

Name
Elaine Thienprasiddhi
Agency Name
City of Anaheim
Contact Types
Lead/Public Agency

Location

Cities
Anaheim
Counties
Orange
Regions
Citywide
Cross Streets
Entire City
Total Acres
approx. 35,000
State Highways
I-5/SR-57/SR-55/SR-22/SR-241
Railways
UP/SCRRA
Airports
Fullerton Mun
Schools
Various
Waterways
Santa Ana River
Other Information
Airports Cont: Jt. Forces Trng. Base Los Alamitos

Notice of Determination

Approving Agency
City of Anaheim
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print