Addendum No. 1 to the Final EIR for the Sedgwick Reserve Infrastructure Plan, Solar Array and Observatory Project
8 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003041096
- Lead Agency
- University of California, Santa Barbara
- Document Title
- Addendum No. 1 to the Final EIR for the Sedgwick Reserve Infrastructure Plan, Solar Array and Observatory Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/5/2007
- Present Land Use
- Academic/Research
- Document Description
- Addendum No. 1 to the Final EIR for the Sedgwick Reserve Infrastructure Plan, Solar Array and Observatory Project The Santa Barbara Campus proposes to install photovoltaic panels and an observatory building at UC Santa Barbara, Natural Reserve System's Sedgwick Reserve. The photovoltaic solar energy project would result in the installation of four arrays of electricity-producing solar panels. In addition to the photovoltaic panels, an Observatory will be installed in proximity to the photovoltaic panels.
- Contact Information
-
Shari Hammond
University of California, Santa Barbara
Lead/Public Agency
Campus Planning and Design 1325 Cheadle Hall 2032
Santa Barbara, CA 93106-2030
Phone : (805) 893-3796
Location
- Counties
- Santa Barbara
- Cross Streets
- Brinkerhoff and Roblar Avenues
- Total Acres
- 6
- Parcel #
- 133-16-056
- State Highways
- 217
- Airports
- Santa Barbara
- Waterways
- Goleta Slough
- Other Location Info
- Nearest City: Los Olivos
Notice of Determination
- Approving Agency
- University of California, Santa Barbara
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- Office of Campus Planning and Design, Facilities Management University of California, Santa Barbara, CA 93106-1030
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.