Addendum No. 1 to the Final EIR for the Sedgwick Reserve Infrastructure Plan, Solar Array and Observatory Project
8 Documents in Project
Summary
SCH Number
2003041096
Lead Agency
University of California, Santa Barbara
Document Title
Addendum No. 1 to the Final EIR for the Sedgwick Reserve Infrastructure Plan, Solar Array and Observatory Project
Document Type
NOD - Notice of Determination
Received
Posted
12/5/2007
Present Land Use
Academic/Research
Document Description
Addendum No. 1 to the Final EIR for the Sedgwick Reserve Infrastructure Plan, Solar Array and Observatory Project
The Santa Barbara Campus proposes to install photovoltaic panels and an observatory building at UC Santa Barbara, Natural Reserve System's Sedgwick Reserve. The photovoltaic solar energy project would result in the installation of four arrays of electricity-producing solar panels. In addition to the photovoltaic panels, an Observatory will be installed in proximity to the photovoltaic panels.
Contact Information
Name
Shari Hammond
Agency Name
University of California, Santa Barbara
Contact Types
Lead/Public Agency
Phone
Location
Counties
Santa Barbara
Cross Streets
Brinkerhoff and Roblar Avenues
Total Acres
6
Parcel #
133-16-056
State Highways
217
Airports
Santa Barbara
Waterways
Goleta Slough
Other Location Info
Nearest City: Los Olivos
Notice of Determination
Approving Agency
University of California, Santa Barbara
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.