Concurrence in the issuance of a revised Solid Waste Facilities Permit (SWFP) for Sycamore Landfill, Inc., Facility No. 37-AA-0023, City of San Diego

11 Documents in Project

Summary

SCH Number
2003041057
Lead Agency
City of San Diego
Document Title
Concurrence in the issuance of a revised Solid Waste Facilities Permit (SWFP) for Sycamore Landfill, Inc., Facility No. 37-AA-0023, City of San Diego
Document Type
NOD - Notice of Determination
Received
Posted
7/16/2015
Present Land Use
Landfill/RS 1-8, AR 1-2/Landfill
Document Description
Revise the existing Solid Waste Facilities Permit to allow an increase in permitted site boundary from 491 acres to 603 acres; an increase in the permitted disposal area from 324 acres to 349.2 acres; an increase in the max elevation from 883 feet to 1,050 feet above mean sea level (amsl); an increase the max depth from 434 ft amsl to 431 amsl; an increase in the max permitted tonnage from 3,965 tons per day to 5,000 tons per day; an increase in the traffic volume from 620 vehicles per day to 869 municipal solid waste tickets per day; include a total design capacity of 147,908,000 cubic yds; and update the estimated closure date from 2031 to 2042.

Contact Information

Name
Virginia Rosales
Agency Name
CalRecycle
Contact Types
Lead/Public Agency

Location

Cities
San Diego, Santee
Counties
San Diego
Cross Streets
Mast Boulevard/I-52
Zip
92145
Total Acres
~419
State Highways
SR 52, 125
Airports
Gellespie Field
Other Location Info
City/Nearest Community:Elliot

Notice of Determination

Approving Agency
CalRecycle
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print