State Route 45 Conventional Highway Segment 4A Project (California Endangered Species Act Incidental Take Permit No. 2081-2018-035-04 (ITP))

18 Documents in Project

Summary

SCH Number
2003041036
Lead Agency
California Department of Transportation, District 6
Document Title
State Route 45 Conventional Highway Segment 4A Project (California Endangered Species Act Incidental Take Permit No. 2081-2018-035-04 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
5/24/2018
Document Description
Project is being implemented to improve the continuity, safety, and capacity of the 1.7 mile segment of SR 46 between pm 31.5 and pm 33.2. The project involves: 1) widening SR 46 between the aforementioned points of conformance, 2) construction of three short segments of connector road in a commercial park north and south of SR 46, and 3) construction of a drainage basin south of SR 46 just west of the same commercial park. Project could result in take of Swainson's hawk (Buteo swainsoni) in the form of mortality due to vehicle strikes, nest abandonment, or destruction of nests resulting in the loss of young, fledglings, or eggs over the five year term of the ITP. Swainson's hawk is listed as threatened under CESA. Permittee will mitigate through the purchase of two (2) Covered Species credits at a CDFW-approved conservation or mitigation bank.

Contact Information

Name
Steve Hulbert
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Kern, San Luis Obispo
State Highways
41, 33
Schools
Lost Hills Union School District
Waterways
CA Aqueduct
Other Location Info
City: Lost Hills

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.