Pacific Bell Rancho San Diego Telecommunications Site Major Use Permit; MUP 01-008; Log No. 01-19-008

Summary

SCH Number
2003039031
Lead Agency
San Diego County
Document Title
Pacific Bell Rancho San Diego Telecommunications Site Major Use Permit; MUP 01-008; Log No. 01-19-008
Document Type
NOD - Notice of Determination
Received
Posted
3/18/2003
Document Description
The project proposes a one-story telecommunications building measuring 12,602.5 square feet, in addition to an existing 7,211 square foot switching station. The proposed project will also consist of a chillers enclosure extension area, expanded parking area, concrete access walkway, expanded asphalt paving, expanded planting area, and a designated loading area and loading dock. All lots will be on sewer provided by the Spring Valley Sewer District and water services provided by the Otay Municipal Water District. Grading proposed for project implementation will involve approximately 200 cubic yards of excavation and 200 cubic yards of exported soil with a depth of 2-3 feet. Access to the project site is from Cuyamaca College Drive West. The project is located at 2966 Jamacha Road in the Valle de Oro Community Planning Area within an unincorporated portion of San Digeo County. The entire project will be served by the following agencies/districts: El Cajon Valley Union School District Grossmont Union High School District, Otay Municipal Water District, Spring Valley District, and the San Miguel Consolidated Fire Protection District.

Contact Information

Name
Emery McCaffery
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego

Notice of Determination

Approving Agency
County of San Diego Planning Commission
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.