Robert Mondavi Properties at Suscol Springs Vineyard
5 Documents in Project
Summary
SCH Number
2003032132
Lead Agency
Napa County
Document Title
Robert Mondavi Properties at Suscol Springs Vineyard
Document Type
NOD - Notice of Determination
Received
Posted
3/29/2005
Present Land Use
Zoning: AW: AC (Agricultural Watershed Airport Compatibility)
Land Use: AWOS (Agricultural, Watershed and Open Space)
Document Description
#99323-ECPA is the site specific design of erosion control measures to manage water run-off and sediment movement (earthmoving activities) on slopes greater than 5 percent. The erosion control measures as designed in #99323-ECPA would be installed and maintained in conjunction with the subsequent new vineyard. The erosion control measures include surface drainage mainlines, drop inlets, gravity outlets, diversion ditches, water bars, straw bale sediment traps, rock sediment basins, insloped vineyard avenues (woudl be covered with straw mulch during rainy seasons) separating vineyard blocks, rock slope protection, rock level spreaders, and no-till cover crop (mowed and reseeded as necessary).
Contact Information
Name
Mary Doyle
Agency Name
Napa County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Napa
Counties
Napa
Cross Streets
State Route 221
Zip
94559
Total Acres
160
Parcel #
046-400-034
State Highways
SH-221
Airports
Napa County
Waterways
Napa River
Notice of Determination
Approving Agency
Napa County Conservation, Development and Planning Dept.
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.