Lower Lagoon Valley Policy Plan Implementation Project (Lake or Streambed Alteration Agreement No. EPIMS-SOL-28360-R3)

13 Documents in Project

Summary

SCH Number
2003032063
Lead Agency
City of Vacaville
Document Title
Lower Lagoon Valley Policy Plan Implementation Project (Lake or Streambed Alteration Agreement No. EPIMS-SOL-28360-R3)
Document Type
NOD - Notice of Determination
Received
Posted
12/28/2022
Document Description
The project includes installation or replacement of four box culverts; installation of four pedestrian golf cart bridges; installation of five storm drain outfalls and associated rock riprap; installation of stormwater detention ponds; installation of temporary diversion structures, crossings, open trench utility crossings, and horizontal directional drilling of utility crossings; fill of aquatic features; removal of one culvert; and preservation, creation, restoration, and enhancement of aquatic features.

Contact Information

Name
Alex Single
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Vacaville
Counties
Solano
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located at Lagoon Lake, nine unnamed tributaries and wetland areas associated with Lagoon Lake, and the Bypass Channel to Laguna Creek immediately east of Interstate 80 in the City of Vacaville. The approximate project centroid is Latitude 38.32417°, Longitude -122.01027°.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Solano
Final Environmental Document Available at
2825 Cordelia Road, Suite 100, Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print