Topaz Reservoir Inlet Canal Levee and Dam Reconstruction Project
5 Documents in Project
Summary
SCH Number
2003032047
Lead Agency
Fish & Game #6
Document Title
Topaz Reservoir Inlet Canal Levee and Dam Reconstruction Project
Document Type
NOD - Notice of Determination
Received
Posted
7/3/2003
Present Land Use
Agricultural
Document Description
Move and reconstruct diversion structure on canal entrance and on river. Construct new 800 feet wing levee. Raise 6500 lineal feet of levee and 4500 lineal feet of dam, three feet with the fill material falling to the landside of the levee and dam.
Contact Information
Name
Dawne Becker
Agency Name
Department of Fish and Game, Region 6
Contact Types
Lead/Public Agency
Phone
Location
Counties
Mono
Cross Streets
State Highway 89 and State Highway 395
Total Acres
12
State Highways
395
Waterways
W. Walker River, Topaz Lake
Township
9N
Range
22E
Section
12
Other Location Info
Topaz Lake
Notice of Determination
Approving Agency
Dept. of Fish and Game
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.