Riverside Corona Feeder (RCF) Project

10 Documents in Project

Summary

SCH Number
2003031121
Lead Agency
Western Municipal Water District
Document Title
Riverside Corona Feeder (RCF) Project
Document Type
NOD - Notice of Determination
Received
Posted
5/25/2005
Present Land Use
Various land uses, primarily road right-of-ways / Various / Various
Document Description
The Riverside-Corona Feeder Project will install a water transmission pipeline from the San Bernardino Basin Area to increase firm water supplies, reduce water costs, and improve water quality. The project will deliver water, captured in wet years and stored in a groundwater basin, to communities throughout western Riverside County in dry years via 28 miles of pipeline will be capable of delivering up to 40,000 acre-feet per year of ground water at 100 cubic feet per second (cfs) from the San Bernardino Basin Area to the District's customers and to water purveyors within the District's boundaries. The project will also include: several turnouts along the major feeder, a 2,500 horsepower pump station designed to lift water from the City of Riverside's Waterman Pipeline into the project which operates at a hydraulic gradient line of 1250 +/-, and up to 20-350 HP x 2,200 gallons per minute (GPM) new or existing groundwater production wells to be located within the San Bernardino Basin Area.

Contact Information

Name
John Rossi
Agency Name
Western Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Colton, Colton, Corona, Grand Terrace, Highland, Riverside, ..., Corona, Grand Terrace, Highland, Riverside, San Bernardino
Counties
Riverside, San Bernardino
Cross Streets
Various
Zip
Various
Total Acres
~ 30 linear mi.
Parcel #
Various
State Highways
I-15, I-10, I-215, SR-60, SR-91
Railways
BNSF, UPRR, Metrolink
Airports
SB International
Schools
Various
Waterways
Santa Ana River
Township
3S
Range
4,5,6W

Notice of Determination

Approving Agency
Board of Directors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print