6400 Hollister Storm Drain Clearance and Finestone Channel Improvements

4 Documents in Project

Summary

SCH Number
2003031107
Lead Agency
City of Santa Barbara
Document Title
6400 Hollister Storm Drain Clearance and Finestone Channel Improvements
Document Type
NOD - Notice of Determination
Received
Posted
6/5/2003
Present Land Use
Airport Industrial, Airport Facilities zones. General Plan: Major Public and Institutional
Document Description
The project has two main elements: 1) Clear 14 feet by 20 feet of dense vegetation from a storm drain off of Hollister Avenue; 2) Channel improvements to Finestone Channel to improve capacity to a 25 year event. The channel improvement has three main elements: 1) Replace three (one 30 inch and one 36 inch) culverts with a double box culvert with 5 foot x 5 foot cells; 2) Channel widening to a uniform width of 8 feet from the culverts to approximately 500 feet east; 3) Shallow berm placement for approximately 900 feet beyond the terminus of the channel widening. The project also includes native riparian and wetland restoration, and the grading of a small storm drain near the new culverts as well as 8,400 square feet of overlay pavement on Firestone Road.

Contact Information

Name
Sara Iza
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Fairview and Los Carneros
Parcel #
073-450-003
State Highways
101
Railways
Amtrak
Airports
Project Site
Schools
UCSB; Kellog School; Goleta Valley Jr. High School
Waterways
Pacific Ocean/Goleta Slough

Notice of Determination

Approving Agency
City of Santa Barbara
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.