Los Angeles County Department of Public Works Headquarters Building Seismic Retrofit and Parking Lot Renovation Project

3 Documents in Project

Summary

SCH Number
2003031106
Lead Agency
Los Angeles County
Document Title
Los Angeles County Department of Public Works Headquarters Building Seismic Retrofit and Parking Lot Renovation Project
Document Type
NOD - Notice of Determination
Received
Posted
6/23/2003
Present Land Use
Professional Office (PO)
Document Description
The Los Angeles County Department of Public Works (LACDPW) proposes to retrofit its existing Headquarters building to meet current seismic safety standards, and to renovate the parking lot serving the LACDP Headquarters facility to comply with the County of Los Angeles Standard Urban Stormwater Mitigation Plan (SUSMP) requirements. The proposed seismic retrofit of the Headquarters would provide the 13-story building with an external cable-stayed system design, comprised of a singular structural column at each corner of the building that is structurally connected at each floor corner and tied together by tension cables. The renovated parking lot would provide improved parking, access, and circulation for the facility, and demonstrate simple and economical methods to reduce stormwater runoff and pollution. The LACDPW Headquarters facility would remain open during construction of the proposed project.

Contact Information

Name
Massood Eftekahari
Agency Name
Los Angeles County Department of Public Works
Contact Types
Lead/Public Agency

Location

Cities
Alhambra
Counties
Los Angeles
Cross Streets
Fremont Avenue/Orange Street
Zip
91803
Total Acres
17.85
State Highways
710 Long Beach Freeway
Railways
Yes
Schools
Yes
Township
1S
Range
13W
Section
16
Base
USGS

Notice of Determination

Approving Agency
County of Los Angeles
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print