Joplin Youth Center Road Repair, Pond Reconstruction and Miscellaneous Maintenance Projects Draft Focused EIR

3 Documents in Project

Summary

SCH Number
2003031054
Lead Agency
Orange County
Document Title
Joplin Youth Center Road Repair, Pond Reconstruction and Miscellaneous Maintenance Projects Draft Focused EIR
Document Type
NOD - Notice of Determination
Received
Posted
4/4/2004
Present Land Use
Existing: Joplin Youth Center Correctional Institution; Orange County General Plan: Public Facilities (4); Orange County Zoning: Foothill/Trabuco Specific Plan - Public/Quasi-Public Facility (PQF)
Document Description
The County of Orange is proposing several improvements at the Joplin Youth Center at the 64-bed juvenile facility, which are intended to prevent degradation of the JYC facilities. These maintenance projects and improvements include: drainage control and pond rehabilitation, pond access road repair, visitor parking lot repair and paving, refurbishment of the existing football field and replacement of the garden shed, fuel tank road paving, maintenance parking lot repair, irrigation installation, water tank road repaving, and soil stockpiling.

Contact Information

Name
Donna Cobb
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Rancho Santa Margarita
Counties
Orange
Cross Streets
Trabuco Canyon Road / Rose Canyon Road
Total Acres
338
Waterways
Trabuco Creek

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print