Joplin Youth Center Road Repair, Pond Reconstruction and Miscellaneous Maintenance Projects Draft Focused EIR
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2003031054
- Lead Agency
- Orange County
- Document Title
- Joplin Youth Center Road Repair, Pond Reconstruction and Miscellaneous Maintenance Projects Draft Focused EIR
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/4/2004
- Present Land Use
- Existing: Joplin Youth Center Correctional Institution; Orange County General Plan: Public Facilities (4); Orange County Zoning: Foothill/Trabuco Specific Plan - Public/Quasi-Public Facility (PQF)
- Document Description
- The County of Orange is proposing several improvements at the Joplin Youth Center at the 64-bed juvenile facility, which are intended to prevent degradation of the JYC facilities. These maintenance projects and improvements include: drainage control and pond rehabilitation, pond access road repair, visitor parking lot repair and paving, refurbishment of the existing football field and replacement of the garden shed, fuel tank road paving, maintenance parking lot repair, irrigation installation, water tank road repaving, and soil stockpiling.
- Contact Information
-
Donna Cobb
California Department of Fish and Game
Lead/Public Agency
4949 Viewridge Avenue
San Diego, CA 92123
Phone : (858) 637-5510
Location
- Cities
- Rancho Santa Margarita
- Counties
- Orange
- Cross Streets
- Trabuco Canyon Road / Rose Canyon Road
- Total Acres
- 338
- Waterways
- Trabuco Creek
Notice of Determination
- Approving Agency
- California Department of Fish and Game
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- N/A
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.