MarBorg C&D Waste Recycling and Transfer Facility, 119 N. Quarantina Street

8 Documents in Project

Summary

SCH Number
2003031036
Lead Agency
Santa Barbara County
Document Title
MarBorg C&D Waste Recycling and Transfer Facility, 119 N. Quarantina Street
Document Type
NOD - Notice of Determination
Received
Posted
4/29/2003
Present Land Use
Existing Land Use: Waste Recycling Facility; General Plan Land use Designation: Manufacturing; Zoning Designation: M-1 Light Industrial
Document Description
The project site involves two adjacent parcels totaling 2.5 acres located at 119 North Quarantina Street. The existing facilities on the properties on the properties are the MarBorg waste recycling and transfer station for construction and demolition (C&D) waste (non-hazardous solid waste), and the Pacific Tree Nursery. The project would involve a voluntary lot merger of two parcels involving acquisition of the 0.5-acre nursery parcel and demolition of its on-site structures, and construction of a new metal roof structure to cover the existing uncovered waste recycling/transfer operation. The roof structure is proposed to cover an area of 75,300 square feet, including the reconfigured recovery, sorting, and transfer equipment and operations. Truck queuing and scales will remain outside the roof structure. A separate 1,187 square foot one-story restroom/locker room building and patio area is also proposed for employees. The project includes construction of a 14-foot tall wall along the eastern and northern boundaries of the project site.

Contact Information

Name
Jaime Limon
Agency Name
City of Santa Barbara
Contact Types
Lead/Public Agency

Location

Cities
Santa Barbara
Counties
Santa Barbara
Cross Streets
Quarantina St. between Yanonali and Mason
Parcel #
017-030-007 & -007
State Highways
101
Railways
Union Pacific
Schools
Santa Barbara School Dist. Elm., Jr. High, & High School &
Waterways
Mission Creek, Sycamore Creek, Pacific Ocean

Notice of Determination

Approving Agency
City of Santa Barbara
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print