Modification of Interconnection at the Midway-Buttonwillow PG&E Substation Sunrise Power Project (98-AFC-4C)

Summary

SCH Number
2003028427
Public Agency
The Resources Agency
Document Title
Modification of Interconnection at the Midway-Buttonwillow PG&E Substation Sunrise Power Project (98-AFC-4C)
Document Type
NOE - Notice of Exemption
Received
Posted
2/24/2003
Document Description
Relocate one of the two existing La Paloma/Sunrise 230kV circuits, add a new bay, switches, and relay; add four new transmission lowers, reroute a segment of an existing roadway, and construct a perimeter fence under the new transmission line. All modifications will occur within the existing boundaries of the substation, and are necessary to minimize the potential for a transmission system overload during outages or maintenance activities at the substation due to the additional load from the Sunrise Power Company's combined-cycle expansion project.

Contact Information

Name
Nancy Tronaas
Agency Name
The Resources Agency
Contact Types
Lead/Public Agency

Location

Counties
Kern

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15304(b)
Reasons for Exemption
The modifications are contained within the existing substation facility and will result in a negligible expansion of the existing use.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.