Fitch and Gauntlett Well Water Treatment Project

3 Documents in Project

Summary

SCH Number
2003022064
Lead Agency
City of Healdsburg
Document Title
Fitch and Gauntlett Well Water Treatment Project
Document Type
NOD - Notice of Determination
Received
Posted
4/28/2003
Present Land Use
Public Land
Document Description
The proposed project is to construct a new water treatment facility. The purpose of the project is to treat water from the City of Healdsburg's two Russian River well fields, eliminating an existing seasonal restriction on the use of these wells, and to meet new State standards. After considering other alternatives, the City proposes to construct a single micro-filtration treatment facility at a site adjacent to the City's existing Panorama Reservoir, located at the end of Sunnyvale Drive. An existing 16-inch raw water pipeline connecting the Fitch Well Field and the Tyman Park Reservoirs would be extended approximately 6,500 feet to bring raw water from the Fitch Well Field to the Gauntlett Reservoir. A new booster pump located within the Tayman Park Golf Course, near the #8 fairway, would pump water to the higher Gauntlett Reservoir, where it would be combined with water from the Gauntlett Well Field. From there it would flow by gravity throughout the new treatment facility to the Panorama Reservoir. The City would construct the project in two phases.

Contact Information

Name
Richard Spitler
Agency Name
City of Healdsburg Planning Department
Contact Types
Lead/Public Agency

Location

Cities
Healdsburg
Counties
Sonoma
Cross Streets
East end of Sunnyvale Drive
Zip
95448
Total Acres
3.53
Parcel #
091-040-099
State Highways
101
Railways
NW Pacific Line
Schools
Healdsburg Unified School District
Waterways
Russian River and Dry Creek
Township
9N
Range
8W
Section
Sotoyo
Base
Healdsbu

Notice of Determination

Approving Agency
City of Healdsburg City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print