Rancho Laguna Conditional Develop Plan
6 Documents in Project
Summary
SCH Number
2003022062
Lead Agency
City of Moraga
Document Title
Rancho Laguna Conditional Develop Plan
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2011
Present Land Use
Open Space - MOSO and Open Space - PD
Document Description
The Rancho Laguna II project as approved is a residential subdivision with 27 single-family lots on a 180.2 acre site located on the east side of Rheem Blvd. between Via Barcelona and Fernwood Drive in the Town of Moraga. The project site was formerly part of a larger landholding Known as "Rancho Laguna de Los Palos Colorado." The applicant originally proposed 35 residential lots.
Access to the project will be from Rheem Blvd. along Fay Hill Road. The proposed project clusters 8 residential lots paralleling Rheem Blvd. on D Drive and 19 residential lots in the upper development area along E Street, B Court and C Court. ~ 163 acres of the site will remain in open space.
Contact Information
Name
Lori Salamack
Agency Name
City of Moraga Planning Department
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Moraga
Counties
Contra Costa
Cross Streets
Rheem Boulevard / St. Mary's Boulevard
Zip
94556
Total Acres
180.0
Parcel #
256-040-024
Schools
Donald L. Rheem, Joaquin Moraga, Campolindo HS
Waterways
Las Trampas Creek
Township
1S
Range
2W
Section
7 & 8
Base
Mt. Diab
Notice of Determination
Approving Agency
Town Council of Moraga
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.