Addendum to FEIR 584 and FEIR 589, Lapeyre Industrial Sands Pond Project
40 Documents in Project
Summary
SCH Number
2003021141
Lead Agency
Orange County
Document Title
Addendum to FEIR 584 and FEIR 589, Lapeyre Industrial Sands Pond Project
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2017
Present Land Use
Planned Community District/Suburban Residential
Document Description
Project proposes to construct a small pond as a replacement facility for the LIS quarry. With the reconstruction of the Trampas Canyon Dam and Reservoir for recycled water storage, the pond would be required to avoid operational impacts to the LIS quarry. The pond would have a surface area of approx. 37,890 sq. ft. (0.87 acre). The capacity of the pond would be approx. 17.0 acre-feet of with a maximum water depth of 43 feet. An access road would be constructed to provide access to the pond, which would also be used as a haul route during construction. The access road would be 10 feet wide with a 4-foot vegetated swale downstream of the roadway for pretreatment of access road runoff, leading to an infiltration trench.
Contact Information
Name
Don Bunts
Agency Name
Santa Margarita Water District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Juan Capistrano
Counties
Orange
Cross Streets
Ortega Highway and La Pata Avenue / Antonio Parkway
Zip
92693
Total Acres
277
State Highways
SR 74
Schools
San Juan Hills HS
Waterways
San Juan Creek
Other Location Info
Ladera Ranch, Ranch Plan Planned Community
Notice of Determination
Approving Agency
Santa Margarita Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.