Pipelines 3 and 4 Relining

2 Documents in Project

Summary

SCH Number
2003021138
Lead Agency
San Diego County Water Authority
Document Title
Pipelines 3 and 4 Relining
Document Type
NEG - Negative Declaration
Received
Present Land Use
Future Growth, Open Space and Military
Document Description
The project consists of the installation of a steel liner in 31,455 lineal feet of existing 66-inch, 69-inch, 72-inch and 96-inch pipe located in the Rancho Penasquitos area; specifically from Black Mountain to the Miramar Hill area southerly of Mercy Road near I-15. Pipelines 3 and 4, together with Pipeline 5, from the Second San Diego Aqueduct, one of two underground pipeline aqueduct systems delivering water to San Diego County. In addition, three temporary pipeline connection vaults will be installed, one each in the Mira Mesa and Scripps Ranch communities, and one adjacent to MCAS Miramar near Highway 52.

Contact Information

Name
Tim Cass
Agency Name
San Diego County Water Authority
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Black Mountain to Miramar Hill area southerly of Mercy Road
Total Acres
31,455ftofpipeli
Parcel #
Multiple
State Highways
52,15
Airports
MCAS
Schools
Sunset Hills,Black Mountain,Mount Carmel,Miramar Ranch
Township
14,15S
Range
2W
Base
SB

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Conservation (DOC), California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), California State Lands Commission (SLC), Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance
Development Types
Other (Installation of a steel liner in 31,455 lineal feet of existing)
Local Actions
Site Development Permit
Project Issues
Geology/Soils, Land Use/Planning, Noise, Vegetation, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print