Enhanced In-Situ Bioremediation with Bioaugmentation, Boeing Reality Corporation, Former C-1 Facility, Long Beach, Calilfornia
2 Documents in Project
Summary
SCH Number
2003021104
Lead Agency
Regional Water Quality Control Board, Region 4 (Los Angeles)
Document Title
Enhanced In-Situ Bioremediation with Bioaugmentation, Boeing Reality Corporation, Former C-1 Facility, Long Beach, Calilfornia
Document Type
NOD - Notice of Determination
Received
Posted
4/14/2003
Present Land Use
Commercial / Industrial
Document Description
Under the oversight of the Regional Board, Boeing Realty Corporation (BRC) is investigating and remediating soil and groundwater impacts at the 343-acre C-1 Facility. BRC proposes to implement enhanced in-situ bioremediation (EISB) with bioaugmentation technologies to remediate selected source areas. These technologies involve addition of selected amendments [amendments specified in the General WDR Permit package, and in some areas using a non-pathogenic, naturally derived (i.e. not genetically engineered), chlorinated ethene degrading consortium, referred to as KB-1 containing a Dehalococcoides ethenogenes culture] to create a reducing condition in groundwater to facilitate reductive dechlorination of chlorinated volatile organic compounds.
Contact Information
Name
John Geroch
Agency Name
Regional Water Quality Control Board, Region 4 (Los Angeles), Mo
Contact Types
Lead/Public Agency
Phone
Location
Cities
Long Beach
Counties
Los Angeles
Cross Streets
Lakewood Blvd. and Carson St.
Zip
90846
Total Acres
343
Parcel #
7149-001-012
State Highways
405
Airports
Long Beach
Notice of Determination
Approving Agency
California Regional Water Quality Control Board, Los Angeles Reg
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No