McAuliff Street Construction South of Houston Avenue

2 Documents in Project

Summary

SCH Number
2003021101
Lead Agency
City of Visalia
Document Title
McAuliff Street Construction South of Houston Avenue
Document Type
NEG - Negative Declaration
Received
Present Land Use
Arterial Roadway
Document Description
The construction of McAuliff Street between Mineral King Avenue and Houston Avenue proposed as an 8-foot wide right-of-way standard roadway with additional ROW of 20 feet on the west side for future construction of a 10-foot wide bike path separated from the roadway by 10-feet of landscaping. Mill Creek Parkway will be extended to the new McAuliff Street. MucAuliff Street will require the crossing of Mill Creek and Evans Ditch, which will require subsequent changes in flow control of these two waterways. Mill Creek may require a new headgate structure, a new culvert with headwalls at McAuliff Street, the relocation of the Parshall flume and the relocation of a flow control measuring station. Evans Ditch will require a new headgate structure and a new culvert structure with headwalls at McAuliff Street. The project will also include the following improvements to existing storm water, sewer, water, and utility facilities: a) Storm Drainage: westerly extension of the storm drainage line in Douglas Avenue; construction of roadside swales in area without curb and gutter, construction of curb and gutter to existing facilities, and b) Utilities: relocation and improvement of existing utility facilities as required by the project's construction. The traffic signals and lighting at Houston Avenue and McAuliff Street will be relocated. The relocation of existing utility lines and poles, and the acquisition of right-of-way will also be required during the project's construction.

Contact Information

Name
David Jacobs
Agency Name
City of Visalia
Contact Types
Lead/Public Agency

Location

Cities
Visalia
Counties
Tulare
Cross Streets
Houston / Mineral King Avenues
Total Acres
1
State Highways
198
Schools
Golden West High School
Waterways
Mill Creek
Township
18S
Range
24E
Section
28

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California State Lands Commission (SLC), Department of Water Resources, Resources Agency, California Department of Transportation, District 6 (DOT), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB)
State Reviewing Agency Comments
California Department of Transportation, District 6 (DOT), California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB)
Development Types
Transportation:Local Road (Construction)
Local Actions
Annexation
Project Issues
Aesthetics, Air Quality, Cultural Resources, Hydrology/Water Quality, Wetland/Riparian, Wildlife

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print