Waste Discharge Requirements General Order for Growers within the Eastern San Joaquin River Watershed that are Members of the Third-Party Group

13 Documents in Project

Summary

SCH Number
2003021100
Lead Agency
Regional Water Quality Control Board, Region 5 (Central Valley)
Document Title
Waste Discharge Requirements General Order for Growers within the Eastern San Joaquin River Watershed that are Members of the Third-Party Group
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2013
Document Description
The project is the adoption of waste discharge requirements. The project establishes requirements to regulate discharges of waste from irrigated lands to surface water and groundwater to assure water quality standards are met. Irrigated lands are lands irrigated to produce crops or pasture for commercial purposes; nurseries; and privately and publicly managed wetlands that do not currently discharge under water discharge requirements, National Pollutant Discharge Elimination System (NPDES) permits, Municipal Separate Storm Sewer System permits, or other NDPES permits.

Contact Information

Name
Kenneth D. Landau
Agency Name
Regional Water Quality Control Board, Region 5 (Central Valley),
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield, Fresno, Redding, Sacramento

Notice of Determination

Approving Agency
California Regional Water Quality Control Board, Central Valley
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print