IEUA RP-4 West Extension Recycled Water Pipeline

Summary

SCH Number
2003019005
Lead Agency
Inland Empire Utilities Agency
Document Title
IEUA RP-4 West Extension Recycled Water Pipeline
Document Type
NOD - Notice of Determination
Received
Posted
1/3/2003
Document Description
The pipeline proposed for installation will range from 24-to 30-inches in diameter. For the 4th Street alternative, the 30-inch pipeline will be installed within the existing road easements over a distance of approximately 21,000 lineal feet. The 24-inch pipeline will be installed within existing road easements over a distance of approximately 5,800 lineal feet. The distance is about the same for the 6th Street Alternative and about 30,000 lineal feet for the Arrow Route 4th Street Alternative. Recycled water will be distributed from RP-4 using already approved recycled water pumps at this facility. The volume of recycled water to be distributed through this pipeline will vary depending upon future demand, but several thousand acre-feet of recycled water can be distributed to meet future demand. Potential users of recycled water along this pipeline include the City of Rancho Cucamonga; several industrial operations in the 4th Street corridor; Arrow Route Corridor or the Sixth Street corridor; and several recharge basins, managed by the Chino Basin Watermaster. The RP-4 Corridor or the Sixth Street corridor; and several recharge basins, managed by the Chino Basin Watermaster. The RP-4 West Extension Distribution Line is a key backbone infrastructyre pipeline that will ultimately allow connections to six or more separate recharge basin complexes.

Contact Information

Name
Richard Atwater
Agency Name
Inland Empire Utility Agency
Contact Types
Lead/Public Agency

Location

Cities
Rancho Cucamonga
Counties
San Bernardino

Notice of Determination

Approving Agency
Inland Empire Utilities Agency
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print