McCormack-Williamson Tract Levee Modification and Habitat Restoration Project - Phase B

12 Documents in Project

Summary

SCH Number
2003012112
Lead Agency
California Department of Water Resources (DWR)
Document Title
McCormack-Williamson Tract Levee Modification and Habitat Restoration Project - Phase B
Document Type
NOD - Notice of Determination
Received
Posted
9/8/2022
Document Description
The project purpose is to implement flood control improvements in a manner that benefits aquatic and terrestrial habitats, species, and ecological processes, and incorporates landscape scale restoration of Delta habitat. The project was previously analyzed in the North Delta Flood Control and Ecosystem Restoration Project (North Delta) EIR prepared by DWR. The North Delta Draft EIR was prepared in 2007 and the Final EIR prepared and certified in 2010. Since certifying the North Delta EIR in 2010, DWR has separated the MWT project into Phases A and B. DWR prepared an addendum to the North Delta EIR and constructed Phase A components in 2018 and 2019. The Phase B project consists of implementing the remaining project components of the larger MWT project. A Supplemental EIR has now been prepared for Phase B and provides supplemental information and analyzes project specific impacts not presented in the North Delta EIR. The focus of this Supplemental EIR is to evaluate changes in circumstances under which the project is undertaken and new available information since the North Delta EIR was certified in 2010, including changes to the physical environment at MWT from flooding in 2017, subsequent abandonment of agricultural production, and construction of the Phase A project components in 2018 and 2019. Extensive hydraulic modeling was performed using an updated regional model and new flood information from 2017, resulting in changes to the project design. The project changes and/or additions are minor and are proposed to optimize the project to best meet project objectives under the changed conditions and minimize environmental impacts. The Phase B project consists of levee modifications and habitat restoration. Levee modifications include lowering sections of the MWT East and Southwest Levees and a section of the Mokelumne River Levee and repairing a small section of the MWT West Levee. Habitat restoration consists of enhancing the landside levee slope and habitat for the MWT East and Southwest Levees and modifying landform to restore previous agriculture land to habitats–subtidal open water/shallow subtidal, tidal marsh, and riparian scrub/mixed riparian woodland/valley oak woodland habitats. Additionally, the Phase B project includes decommissioning utilities on MWT, including abandoned gas lines and gas wells and relocating SMUD distribution lines off MWT.

Contact Information

Name
Anitra Pawley
Agency Name
Department of Water Resources
Job Title
In-Delta Investments/North Delta Program Manager
Contact Types
Lead/Public Agency

Location

Cities
unincorporated area
Counties
Sacramento
Regions
Countywide
Cross Streets
Adjacent to Interstate 5. The project site is off Levee Road.
Zip
98514
Total Acres
1,635
Parcel #
N/A
State Highways
I-5 SR 160
Railways
N/A
Airports
N/A
Schools
Walnut Grove Elementary
Waterways
Mokelumne River, Snodgrass Slough, Sacramento River
Township
N/A
Range
N/A
Section
N/A
Base
N/A

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On
County Clerk
Sacramento
Final Environmental Document Available at
https://water.ca.gov/News/Public-Notices

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV Download All Attachments New Search Print