Pacific Gas and Electric, Former Manufactured Gas Plant Site

4 Documents in Project

Summary

SCH Number
2003012103
Lead Agency
Department of Toxic Substances Control
Document Title
Pacific Gas and Electric, Former Manufactured Gas Plant Site
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2003
Present Land Use
The Site is currently zoned for heavy commercial/light industrial use. One area of the Site is currently used as a natural gas regulating station.
Document Description
The Department of Toxic Substances Control (DTSC) is proposing to approve a draft Remedial Action Plan (RAP) that would allow Pacific Gas and Electric (PG&E) to conduct activities designed to remediate soil and groundwater contamination at the project site. The draft RAP was prepared in accordance with H&SC Section 253561. If approved, the RAP would allow for the excavation and off-site transport of approximately 7,000 cubic yards of soil contaminated with total petroleum hydrocarbon-diesel.

Contact Information

Name
Jerry Lile
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Redding
Counties
Shasta
Cross Streets
SE corner of South Street and Waldon Street
Zip
96001
Total Acres
0.4 acres
Parcel #
101-750-33; 101-750-35; 101-750-35; 101-750-36
State Highways
299 and I-5
Railways
Union Pacific Railroad
Waterways
Sacramento River
Township
32N
Range
5W
Section
36

Notice of Determination

Approving Agency
Department of Toxic and Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print