California State University Hayward, Business and Technology Building, Schematic Plan Approval

2 Documents in Project

Summary

SCH Number
2003012060
Lead Agency
California State University, Hayward
Document Title
California State University Hayward, Business and Technology Building, Schematic Plan Approval
Document Type
NOD - Notice of Determination
Received
Posted
5/15/2003
Present Land Use
Master Planned for this use: Educational
Document Description
The Business and Technology Building will be a 42,000 ASF/66,960 GSF instructional and research facility that will add important new capabilities to the campus and will address significant existing deficiencies in faculty office space. The project will accommodate 1,242 FTE in lecture space, 39 FTE in upper division laboratory space, 16 FTE in lower division laboratory space and faculty offices for the business and engineering programs, to be occupied by November 2006. The project also includes a 250 seat presentation center, a student service center, an information commons and will be the home of the College of Business and Economics. The steel-frame building will use eergy efficient glazing and a metal skin system, supporting a flexible high technology learning.

Contact Information

Name
Ricardo Sanchez
Agency Name
California State University, Hayward
Contact Types
Lead/Public Agency

Location

Counties
Alameda
Cross Streets
Carlos Bee Boulevard - Loop Road
Total Acres
0.6
State Highways
238/580
Other Location Info
Hayward

Notice of Determination

Approving Agency
Trustees of the CSU
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print