Otay II Second Pipeline Improvements Program

3 Documents in Project

Summary

SCH Number
2003011124
Lead Agency
City of San Diego
Document Title
Otay II Second Pipeline Improvements Program
Document Type
NOD - Notice of Determination
Received
Posted
9/19/2024
Document Description
Access to potable water is a basic requirement in urbanized areas and the City of San Diego Water Department serves more than 1.2 million people populating more than 200 square miles of developed land. The primary objective of the Project is to maintain a reliable source of potable water through the maintenance, repair, and for some segments, replacement of the aging Otay II Pipeline. In addition, the Water Department proposes to upgrade the cathodic protection system to minimize adverse effects of corrosion along new and old segments of the pipeline. The eight phases of the Project, plus a completed section of the alignment, extend over 19 miles through three local jurisdictions: City of San Diego, County of San Diego, and City of Chula Vista. Phases I, II, IV, and VII involve replacement and/or rehabilitation of existing pipeline. Phase III would include the installation of a cathodic protection system along a total of approximately 58,000 lf of the existing pipeline. Phase V would entail negotiating with the Sweetwater Authority to transfer approximately 33 domestic water services from the Otay II pipeline to the Sweetwater Authority. Installation of a new pump station and distribution system may be required. Phase VI would be completed under a participation agreement with a private developer who would replace a 17,000 lf segment of pipeline within future streets on Otay Ranch. Phase VIII would consist of the installation of approximately 5,000 lf of new pipeline in a yet-to-be determined alignment.

Contact Information

Name
Scott Vurbeff
Agency Name
City of San Diego
Job Title
Associate Planner
Contact Types
Lead/Public Agency

Name
McGinnis
Agency Name
City of San Diego
Job Title
Analyst
Contact Types
Lead/Public Agency

Location

Cities
Chula Vista, San Diego
Counties
San Diego
Regions
Countywide
Cross Streets
Multiple
State Highways
805, 15
Waterways
Chollas Creek
Other Location Info
This pipeline extends approximately 19 miles from the Otay Water Treatment Plant through the City of Chula Vista and County of San Diego to the University Heights area of the City of San Diego.

Notice of Determination

Approving Agency
City of San Diego
Approving Agency Role
Lead Agency
Approved On
County Clerk
San Diego
Final Environmental Document Available at
Development Service Department, 1222 First Avenue, San Diego, CA 92101

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.