Los Angeles Valley College Facilities Master Plan

6 Documents in Project

Summary

SCH Number
2003011110
Lead Agency
Los Angeles Community College District
Document Title
Los Angeles Valley College Facilities Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
4/5/2011
Present Land Use
The Los Angeles Planning and Zone Code designates the project site as a PF-1XL zone for public facilities use in Height District 1, Extra Limited Height. Buildings and structures located in Height District 1, Extra Limited Height (1XL)shall not exceed two stories nor shall the highest point of the roof of any building or structure located in such district exceed 30 feet in height.
Document Description
Updates to the 2003 Valley College Master Plan (Master Plan) were made in 2010. Implementation of the 2010 Master Plan would result in approximately 766,953 gross sq. ft. (GSF) of new construction, renovation, and modernization of 131,177 gsf in existing facilities, and the demolition of other existing buildings containing approximately 158,021 gsf. The proposed 2010 Master Plan Update's buildout year is 2013-14. The estimated annual full time equivalent student levels for 2013-2014 are projected to be 13,804.

Contact Information

Name
Thomas Hall
Agency Name
Los Angeles Community College District
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Oxnard Street, Coldwater Canyon, Burbank Boulevard, Fulton Ave.
Zip
91401
Total Acres
105
Parcel #
2341-025-903
State Highways
U.S. 101, SR 170
Railways
UPRR
Schools
Yes
Waterways
Tujunga Wash
Township
1N
Range
15W
Section
11 &14
Other Location Info
City/Community: Valley Glen

Notice of Determination

Approving Agency
Los Angeles Community College District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print