Los Angeles Valley College Facilities Master Plan

6 Documents in Project

Summary

SCH Number
2003011110
Lead Agency
Los Angeles Community College District
Document Title
Los Angeles Valley College Facilities Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
9/5/2003
Present Land Use
The Los Angeles Planning and Zone Code designates the project site as a PF-1XL zone for public facilities use in Height District 1, Extra Limited Height. Buildings and structures located in Height District 1, Extra Limited Height (1XL)shall not exceed two stories nor shall the highest point of the roof of any building or structure located in such district exceed 30 feet in height.
Document Description
Los Angeles Valley College has developed a Facilities Master Plan that proposes construction of new facilities, renovation of and additions to existing facilities, demolition of several existing buildings, and the development of new surface parking, landscaping, and open space. The proposed Facilities Master Plan would include new construction, renovation and modernization of existing facilities, and demolition of a number of existing buildings on the campus. With the proposed improvements, there would be a net increase in building floor space on the campus of approximately 256,000 gross square feet (gsf). Currently, campus buildings contain approximately 600,000 gsf of space. The construction of projects proposed under the Master Plan is expected to commence in 2003 and continue through approximately the year 2008. It is anticipated that the new and renovated facilities would accommodate and meet the educational needs of a future student population of approximately 23,000 students. In the Fall 2001 semester, there were 18,487 students enrolled at Valley College. Approximately 76 percent of the students were part-time students and 24 percent were full-time students. Funding for a portion of the projects identified in the Facilities Master Plan would be provided through the $1,245 billion Proposition A bond measure passed in the Spring of 2001 by the voters of Los Angeles County. The total bond distribution to Valley College under Proposition A is approximately $165 million.

Contact Information

Name
Barbara Chiavelli
Agency Name
Los Angeles Community College District
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
Oxnard Street, Coldwater Canyon, Burbank Boulevard, Fulton Ave.
Zip
91401
Total Acres
105
Parcel #
2341-025-903
State Highways
U.S. 101, SR 170
Railways
UPRR
Schools
Yes
Waterways
Tujunga Wash
Township
1N
Range
15W
Section
11 &14
Other Location Info
City: Valley Glen

Notice of Determination

Approving Agency
Los Angeles Community College District
Approving Agency Role
Lead Agency

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print