Unexploded Ordinance Soil Investigation and Removal Action at Camp Ibis, Needles, California

2 Documents in Project

Summary

SCH Number
2003011057
Lead Agency
Department of Toxic Substances Control
Document Title
Unexploded Ordinance Soil Investigation and Removal Action at Camp Ibis, Needles, California
Document Type
NOD - Notice of Determination
Received
Posted
5/12/2003
Present Land Use
The land use on the project site and the area surrounding the site is open space. Highway 95 tranverses through the western portion of the project area. The Camp is located in the desert area of southern California and is sparsely covered with arid vegetation such as cacti. Very few trees exist on the project area.
Document Description
The Army Corp of Engineers proposes to conduct a non-time critical investigation and removal that includes site characterization, identification of potential safety problems associated with the unexploded ordinance (UXO), risk management evaluation, UXO detonation if necessary, and evaluation and selection of alternatives for the site. Site characterization efforts involve a geophysical survey and intrusive sampling to assess the Camp's UXO density and contamination. The total area idenitified for the engineering evaluation and cost analysis / interim removal action is 100 acres distrubted over 13,398 acres of the former Camp. The overall investigation and removal activities of potentially contaminated soil will take approximately 15 weeks at Camp Ibis.

Contact Information

Name
Omoruyi Patrick
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Needles
Counties
San Bernardino
Cross Streets
Hwy 95
Zip
92363
Total Acres
13.398
State Highways
95
Airports
Laughlin

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print