Salinas River Storm Drain Pipes
2 Documents in Project
Summary
SCH Number
2002129057
Lead Agency
San Luis Obispo County
Document Title
Salinas River Storm Drain Pipes
Document Type
NOD - Notice of Determination
Received
Posted
12/27/2002
Document Description
As part of an approved development plan for 46 parcels, the project will install an 18-inch diameter storm drain and headwall in the Salinas River floodplain, above the ordinary high water level. The project site is located on the north side of 15th Street, adjacent to the Salinas River in the community of San Miguel (northern San Luis Obispo County). Approximately 1100 cubic yards of fill will be placed within the 100-year floodplain, covering an area of about 0.12 acre. Outflow from the storm drain will be dissipated using standard riprap slope protection. No other structures will be constructed, nor will there be any equipment used in the Salinas River, side channel, or riparian corridor. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number R3-2002-0659 pursuant to section 1603 of the Fish and Game Code to the project operator, Mr. Scott Smith, People's Self Help Housing Corporation.
Contact Information
Name
Scott Wilson
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Luis Obispo
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.