2002 SFPP Line Section 25 and 47 Pipeline Repair Project
Summary
SCH Number
2002128438
Public Agency
State Water Resources Control Board
Document Title
2002 SFPP Line Section 25 and 47 Pipeline Repair Project
Document Type
NOE - Notice of Exemption
Received
Posted
12/26/2002
Document Description
SFPP, LP. operating partnership for Kinder Morgan Energy Partners, L.P. has proposed to inspect and repair two pipelines, LS 25 and LS 47. There will be a total of 53 dig sites along LS 25 and LS 47. From these dig sites, 41 dig sites to repair LS 25 and 6 dig sites to repair LS 47 are within special statues species habitat. The majority of the LS 47 alignment parallels LS 25 with approximately 4 feet. The inspection and repair work for each of the dig sites will occur over a 3 to 4 day period. The inspection and repair of the pipeline will result in the temporary impact of 0.84 acres along LS 25 and 0.16 acre along LS 47 of jurisdictional wetlands and waters. The actual excavation will be about 10 feet by 20 feet at each dig site.
Contact Information
Name
Oscar Balaquer
Agency Name
State Water Resources Control Board, Division of Water Quality
Contact Types
Lead/Public Agency
Phone
Location
Counties
Contra Costa, Solano, Yolo
Notice of Exemption
Exempt Status
Statutory Exemption
Type, Section or Code
21080.21/21080.23
Reasons for Exemption
According to CEQA Section 21080.21, CEQA does not apply for minor excavation project with less than one mile within a public street or highway. Moreover, Section 21080.23 of CEQA provides Statutory exemption for minor excavation such as those planned for this project.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.