New Golf Cart Bridge Over Permanente Creek, Project 01-35

3 Documents in Project

Summary

SCH Number
2002122123
Lead Agency
City of Mountain View
Document Title
New Golf Cart Bridge Over Permanente Creek, Project 01-35
Document Type
NOD - Notice of Determination
Received
Posted
7/7/2005
Present Land Use
General Plan: Zone PF, Public Facilities
Document Description
This project will construct a new twelve foot wide, two-way golf cart bridge over Permanente Creek for the Shoreline Golf Links located in Shoreline at Mountain View Regional Park. The golf course is divided by Permanente Creek with the club house and front nine holes on the east side of the creek and the driving range and back nine holes on the west side. Currently, there is a single 6-foot wide bridge to handle the golf carts and pedestrians moving in both directions. This situation creates both congestion and safety concerns. This project will install a new bridge across Permanente Creek wide enough to safely accommodate two-way golf cart traffic. The centerline of the new bridge will be located 66 feet south (upstream) of centerline of the existing 6-foot wide bridge. The project will include construction of two bridge abutments with cast-in-drilled-hole (CIDH) pile foundations at the tops of the creek banks, installation of an 80' x 12' prefabricated steel truss bridge, and other miscellaneous site work necessary for the new bridge.

Contact Information

Name
Jack Muench
Agency Name
City of Mountain View
Contact Types
Lead/Public Agency

Location

Cities
Mountain View
Counties
Santa Clara
Cross Streets
North Shoreline Boulevard
Total Acres
<1
Parcel #
116-04-004 and 116-05-076
State Highways
85, 101
Railways
JPB Caltrain
Airports
Moffett Field
Waterways
Stevens Creek and Permanente Creek

Notice of Determination

Approving Agency
Mountain View City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print