Stanly Ranch Vineyards Subdivision
3 Documents in Project
Summary
SCH Number
2002122079
Lead Agency
City of Napa
Document Title
Stanly Ranch Vineyards Subdivision
Document Type
NOD - Notice of Determination
Received
Posted
3/21/2003
Present Land Use
Vineyard/Planned Community/Agricultural Resource
Document Description
Request to divide a 708 acre property into 18 parcels ranging in size from 20.0 acres to 212.6 acres. Project approvals include: 1) A General Plan Amendment to change the General Plan land use designation of approximately 426 acres from SA, Study Area to RA, Resource Area; 2) a Rezoning of approximately 426 acres from P-C, Planned Community to AR, Agricultural Resource; 3) Design Review of the proposed Tentative Subdivision Map, 4) a Tentative Subdivision Map to divide the property into 18 lots; 5) a Use Permit to allow the use of Flag Lot access to the proposed lots; 6) a Variance (VA-1) to allow the existing farmworker housing complex on proposed Lot 7 to encroach approximately 24 feet into the required 50-foot side setback adjacent to the new private access road; and 7) a Variance (VA-2) to allow the existing barn on proposed Lot 7 to encroach approximately 8 feet into the required 50-foot side setback adjacent to the new private access road.
Contact Information
Name
Kevin Eberle
Agency Name
City of Napa
Contact Types
Lead/Public Agency
Address
Phone
Location
Cities
Napa
Counties
Napa
Cross Streets
Stanly Lane
Total Acres
7.08
Parcel #
47-240-13,15
State Highways
12,29,121
Airports
Napa County
Waterways
Napa River
Township
5N
Range
4W
Section
MD
Notice of Determination
Approving Agency
City of Napa
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.