Ord Ferry Bridge Seismic Retrofit Project

6 Documents in Project

Summary

SCH Number
2002122056
Lead Agency
Butte County
Document Title
Ord Ferry Bridge Seismic Retrofit Project
Document Type
NOD - Notice of Determination
Received
Posted
12/19/2011
Present Land Use
Road Bridge/A-40 (Agricultural, 40-acre minimum)/Orchard and Field Crops
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2011-0122-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Butte County. The Project involves retrofitting of six of the eight bridge piers. This retrofitting will involve driving sheet piles into the Sacramento River approximately 3.5 feet from the existing pile cap and excavating approximately 15 feet of native material that is between the sheet pile and the existing pile cap. The area will then be de-watered and the water will be pumped to the shore for treatment. New 14 inch round steel pipe piles will be driven between the existing pile cap and the sheet pile. Each foundation retrofit will require 12 steel pipe piles, so a total of 72 permanent piles will be required for the Project. A concrete seal course will be placed over the steel pipe piles using the sheet pile as the form. The existing concrete pile cap will be enlarged to cover the new pile. The sheet pile will then be removed.

Contact Information

Name
Jeb Bjerke
Agency Name
DFG, North Central Region
Contact Types
Lead/Public Agency

Location

Counties
Butte
Cross Streets
Ord Ferry Road
State Highways
45
Waterways
Sacramento River
Other Location Info
Hamilton City

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No