Hamilton City Flood Damage and Ecosystem Restoration Project

4 Documents in Project

Summary

SCH Number
2002122048
Lead Agency
Central Valley Flood Protection Board
Document Title
Hamilton City Flood Damage and Ecosystem Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
3/3/2020
Project Applicant
Reclamation District 2140

Document Description
The principle features of the recommended plan are (1) construction of 6.8 miles of setback levee to provide a more reliable form of flood protection to the community and agricultural areas, (2) degradation of the existing "J" levee to allow for reconnection of the river to the flood plain, and (3) restoration of about 1,500 acres of native habitat between the new setback levee and the Sacramento River. Reclamation District 2140, as a responsible agency, prepared an Addendum to the Environmental Impact Statement/Report to evaluate the changed conditions of the project. The State Lands Commission action is an approval of a 25-year General Lease – Public Agency Use through February 27, 2045.

Contact Information
Christopher Huitt
CSLC
100 Howe Avenue
Sacramento, CA 95825

Phone : (916) 574-1900
christopher.huitt@slc.ca.gov

Location

Cities
Hamilton City
Counties
Glenn
Regions
Northern California
Other Location Info
Sacramento River near Hamilton City, Glenn County

Notice of Determination

Approving Agency
CSLC
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
California State Lands Commission Sacramento office

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Notice of Determination
Huitt_W27188_14   PDF 101 K

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print