Formosa Slough Supplemental Environmental Project
3 Documents in Project
Summary
SCH Number
2002121068
Lead Agency
City of San Diego
Document Title
Formosa Slough Supplemental Environmental Project
Document Type
NOD - Notice of Determination
Received
Posted
3/28/2003
Present Land Use
Wetland preserve
Document Description
CDFG is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1601 (SAA #R5-2002-0270) of the Fish and Game Code to the project applicant, Marco Gallegos of the City of San Diego, Metropolitan Wastewater Department. The applicant proposes to implement a biological mitigation project required because of a sewer spill that occurred in February 2000 on Alvarado Creek, a tributary to the San Diego River. The mitigation project consists of altering a tributary drainage to the Formosa Slough by the installation of a sedimentation basin, riser/outfall structure, spillway, and associated grading resulting in impacts to 0.11 acre of jurisdictional stream and brackish marsh, and other non-jurisdictional plant communities. The project shall mitigate by creating 0.22 acre of salt marsh vegetation community, together with 0.18 acre of upland native plants for erosion control, and maintaining the area until the vegetation communities achieve specified success standards. The project is located in the City of San Diego, in San Diego County.
Contact Information
Name
Richard Grunow
Agency Name
City of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Cities
San Diego
Counties
San Diego
Cross Streets
West Point Loma Boulevard at Camulos Street
Total Acres
1.3
State Highways
I-5
Waterways
San Diego River Channel
Other Location Info
Point Loma Community
Notice of Determination
Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.