California State University, Fullerton, Approval of Schematic Plans, Parking Structure I ;
3 Documents in Project
Summary
SCH Number
2002121019
Lead Agency
California State University, Fullerton
Document Title
California State University, Fullerton, Approval of Schematic Plans, Parking Structure I ;
Document Type
NOD - Notice of Determination
Received
Posted
11/18/2004
Present Land Use
Campus Master Plan - Parking, child care, and other facility designations within the CSU Fullerton campus.
Document Description
The project will be constructed on a portion of the existing surface Parking Lot B, displacing 630 spaces while providing 1,601 new spaces. The project will also upgrade parts of surface Parking Lot B and K and a short-term surface lot adjacent to the Titan Student Union, providing a net increase of 971 parking spaces (1,513 spaces in the structure and 88 spaces in surface lots) to the campus inventory. Vehicles will enter and exit the structure off of State College Boulevard via a realignment of West Campus Drive. The parking structure will be five stories plus parking on the roof level for a total of six levels. The structure will be poured-in-place, post-tensioned concrete with a ductile moment frame. The parking structure will have threee glass-backed elevators. The project's east elevation will abut the future Student Recreation Center. New lighting, landscaping, slurry coating and re-stripping of the remaining lots and widening of Dorothy Lane within the campus will complete the site work.
Contact Information
Name
Jay Bond
Agency Name
Trustees of the California State University
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fullerton
Counties
Orange
Cross Streets
North State College Blvd, Nutwood Ave, Yorba Linda Blvd, SR-57
Zip
92834
Total Acres
Various
State Highways
SR-57
Schools
Various
Notice of Determination
Approving Agency
Trustees of the California State University
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.