Westside Parkway Phase 4 Project - Agreement 2009-0060-R4

9 Documents in Project

Summary

SCH Number
2002121014
Lead Agency
City of Bakersfield
Document Title
Westside Parkway Phase 4 Project - Agreement 2009-0060-R4
Document Type
NOD - Notice of Determination
Received
Posted
11/25/2009
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant. Phase 4 of the Westside Parkway corridor, being constructed by Caltrans, includes 2 cast-in-place pre-stressed box girder bridges spanning the Kern River. The Northern Bridge will be ~775 ft long by 39 ft wide and will require 5 columns (3 within the streambed and 2 within the floodplain). The Southern Bridge will be ~688 ft long by 53 ft wide and will require 15 piles (12 within the streambed and 3 within the floodplain). Installation of the new structures will permanently impact 1.927 acres of land and temporarily impact 6.821 acres of land. The proposed mitigation included with the notification further defines the impacts by habitat type and proposes mitigation at the Kern Water Bank. The Project would remove 1 willow (Salix sp.) and 3 cottonwoods (Populus freemontii) over 4 inches in diameter. These trees would be planted on-site at a ratio of at least 3:1. Temporary access roads will require 10.533 cy of compacted native soil. This material will be removed when construction is completed and the area will be returned to preconstruction conditions. The utilities will be constructed by San Joaquin Facilities Management, Inc., by method of open trenching. Utility installation (and area of temporary disturbance) will be within the previously accounted for Project footprint within the Kern River.

Contact Information

Name
Laura Peterson-Diaz
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Bakersfield
Counties
Kern
Cross Streets
Allen Road, Calloway Drive, Coffee Road, Mohawk Street
Zip
93301
State Highways
SR-99, 58
Railways
BNSF
Schools
Columbia, Liberty, CSUB
Waterways
Kern River, Friant-Kern Canal, Cross Valley Canal

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print