S02-16 and V02-04/Chile Bar Slate Mine

2 Documents in Project

Summary

SCH Number
2002112102
Lead Agency
El Dorado County
Document Title
S02-16 and V02-04/Chile Bar Slate Mine
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2003
Present Land Use
Surfacing Mining Operation/ Mineral Resources and Residential Agricultural Forty-acres/ Natural Resource
Document Description
Special Use Permit to allow surface continuation of surface mining operations, including: maintaining existing stockpile of overburden; existing storage and parking area and vehicular travel way; continued locating of propane tank and fuel containment facility; and reclamation of disturbed lands following discontinuance of mining operations; removal of propane tank and fuel facility; removal of overburden stockpile; and revegetation of disturbed areas on approximately 1.90 acres. The variance allows the reduction in the property line setback from 50 to 0 feet for an existing fuel containment facility and reduction from 50 to 5.85 feet for an existing mining processing building.

Contact Information

Name
Pierre Rivas
Agency Name
El Dorado County
Contact Types
Lead/Public Agency

Location

Cities
Placerville
Counties
El Dorado
Cross Streets
SE corner of SR 193 & So. Fork American River
Zip
95667
Total Acres
1.90
Parcel #
089-160-11 & 089-170-13
State Highways
193
Waterways
South Fork American River
Township
11N
Range
10E
Section
25&36
Base
MDM

Notice of Determination

Approving Agency
El Dorado County Planning Department Board of Supervisors
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes