Jefferson Boulevard Widening Project

3 Documents in Project

Summary

SCH Number
2002112086
Lead Agency
City of West Sacramento
Document Title
Jefferson Boulevard Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
1/21/2003
Present Land Use
Existing roadway and adjacent lands, including agriculture, commercial and residential
Document Description
The proposed project would widen a 2.58-mile (4.15-km) segment of Jefferson Boulevard to four lanes between Stone Boulevard and Marshall Road, upgrade and signalize existing intersections, install a new fixed-span bridge over the Yolo Barge Canal to serve southbound traffic, and modify the existing bascule bridge to serve northbound traffic. The project would also modify the existing storm drainage system along Jefferson Boulevard, by culverting existing open drainages and expanding the Morton-Blacker Canal crossing at Jefferson Boulevard. These improvements are intended to improve traffic flow through the Southport Area, and provide infrastructure improvements necessary to allow development under the Southport Framework Plan. The proposed project is a reduced-scale version of a project previously evaluated in a 1996 Environmental Assessment/Initial Study (EA/IS), but never constructed.

Contact Information

Name
Sandra J. White
Agency Name
City of West Sacramento
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
State Highways
84, 50, Bus 80
Railways
Union Pacific RR, Yolo Shortline
Schools
Our Lady of Grace, Bridgeway Island Elementary & Southport Eleme
Waterways
Sacramento River, Deep Water Ship Channel

Notice of Determination

Approving Agency
City of West Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print