Haystack Bridge Replacement Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2014-021-03 (ITP)]

35 Documents in Project

Summary

SCH Number
2002112033
Lead Agency
Sonoma Marin Area Rail Transit Commission
Document Title
Haystack Bridge Replacement Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2014-021-03 (ITP)]
Document Type
NOD - Notice of Determination
Received

Document Description
Project activites include installing an approximately 124-foot long and 23-foot wide retrofitted single leaf rolling bascule bridge over the Petaluma River. Five new support piers will be constructed along with a new operator house. New a new fender system will be installed to protect the piers from vessel collision. The Project will impact longfin smelt (Spirinchus thaleichthys) from hydroacoustic impacts associated with pile driving. Additional impact may occur from inadvertent frac-out of drilling slurry during horizontal directional drilling under the Petaluma River. The project is expected to result in incidental take of Longfin smelt, which is designated as a threatended species under CESA. The ITP referenced above as issued by CDFW authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information
Timothy S. Dodson
CDFW Bay Delta Region
7329 Silverado Trail
Napa, CA 94558

707-944-5513

Location

Coordinates
38°30'40"N 122°47'10.6"W
Cities
Petaluma
Counties
Sonoma Marin
Cross Streets
Airport Blvd and Regional Parkway
Zip
95403
Total Acres
15
Parcel #
134-171-045, 047,055,058,059,-183-008,009
State Highways
US Hwy 101
Railways
SMART Right of Way
Airports
Sonoma County
Schools
Sonoma County Day
Waterways
Mark Creek West
Township
8N
Range
8W

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
CDFW Bay Delta Region 3, 7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search