CWA Section 404 Dredge and Fill Permit, Drainage Improvement Project, City of Fairfield, Solano County; CWA Section 404 Dredge and Fill Permit, Drainage Improve
3 Documents in Project
Summary
SCH Number
2002112029
Lead Agency
Solano Irrigation District
Document Title
CWA Section 404 Dredge and Fill Permit, Drainage Improvement Project, City of Fairfield, Solano County; CWA Section 404 Dredge and Fill Permit, Drainage Improve
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2003
Document Description
Replacement of 570 linear feet of creek with a 48-inch culvert. The creek flows at the base of the water treatment plant's ponds. The bottom of the creek is bedrock, and there is no riparian corridor. The 48-inch culvert will be installed and covered with an appropriate amount of fill. The runoff from the proposed subdivision will be piped downstream, eventually ending up in McCoy Reservoir. The two proposed mitigations for the project are the creation of 0.17 acres of linear wetland acreage drainage swale within the 7.62-acre mitigation area or purchase of wetland credits in the North Suisun Mitigation Fund.
Contact Information
Name
Robert Isaac
Agency Name
Solano Irrigation District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fairfield
Counties
Solano
Cross Streets
Dickson Hill Road & Manual Campos Parkway
Zip
94533
Parcel #
167-180-220, 230; 167-190-240
State Highways
80
Waterways
Solano Irrigation District Irrigation Ditch
Township
05N
Range
01W
Section
07
Base
MDB&M
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A