Upper Little Lake Habitat Restoration and Enhancement Project
7 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2002111107
- Lead Agency
- Fish & Game #7
- Document Title
- Upper Little Lake Habitat Restoration and Enhancement Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 4/5/2004
- Present Land Use
- Open Space (40)
- Document Description
- The proposed project includes replacement of existing dams and spillways and construction of new water conveyance and management structures; removal of sediment, enlargement of a basin and installation of sediment traps; removal of non-native and other vegetation and establishing of native riparian and wetland habitats; construction of earthwork to restore capacity for overbank flooding; realignment and extension of the creek channel; conducting a topographic survey and preparing engineering design; and implementation of various mitigation measures to reduce less-than-significant project impacts on the environment.
- Contact Information
-
Adrienne Disbrow
Department of Fish and Game, Region 7
Lead/Public Agency
407 West Line Street
Bishop, CA 93514
Phone : (760) 873-4412
Location
- Counties
- Inyo
- Cross Streets
- Highway 395
- Total Acres
- 1200
- State Highways
- 395
- Waterways
- Little Lake
- Township
- 23S
- Range
- 28E
- Section
- 5,6,7,
- Other Location Info
- Little Lake
- Other Information
- Section: 5, 6, 7, 8, 17, 18
Notice of Determination
- Approving Agency
- California Department of Fish and Game
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- California Department of Fish and Game 407 West Line Street Bishop, CA 93514
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.