Final EIR Owens Valley PM10 Planning Area Demonstration of Attainment SIP - 2003 Rev.

8 Documents in Project

Summary

SCH Number
2002111020
Lead Agency
Great Basin Air Pollution Control District
Document Title
Final EIR Owens Valley PM10 Planning Area Demonstration of Attainment SIP - 2003 Rev.
Document Type
NOD - Notice of Determination
Received
Posted
11/14/2003
Present Land Use
land use - open space park/recreation zone 05-40-open space zone 40 acre minimum lot size
Document Description
The Great Basin Unified Air Pollution Control District (District) proposes a revised air pollution control strategy, or "program," to bring the Owens Valley PM Planning Area into attainment with the National Ambient Air Quality Standard (NAAQS) for PM (particulate matter) by December 31, 2006, as required by the Clean Air Act Amendments of 1990. This new air pollution control program would be known as the Owens Valley PM Planning Area Demonstration of Attainment State Implementation Plan - 2003 Revision (2003 SIP). The proposed project would include the 2003 SIP and the construction and operation of the following project elements: - Dust Control Measures: (shallow flooding, managed vegetation) [the 2003 SIP also provides for the use of gravel blanket for dust control, however, no gravel is proposed for use as a dust control measure at this time]. - Mainline and Drainline (brineline) water pipeline connections - Subsurface Drainage System - Power Supply and Control - Fertilizer and Water Treatment Injection Systems - Corridors for Utilities, Power Cables and Access Roads - Construction Corridors

Contact Information

Name
Theodore Schade
Agency Name
Great Basin Air Pollution Control District
Contact Types
Lead/Public Agency

Location

Counties
Inyo
Cross Streets
US 395, SR 136, SR 190
Zip
93530
Total Acres
~ 19,000
State Highways
I-395 & 190
Waterways
Owens Lake, Owens River

Notice of Determination

Approving Agency
Great Basin UAPCD
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes