Environmental Assessment No. EA-02-20

2 Documents in Project

Summary

SCH Number
2002111012
Lead Agency
City of Fresno
Document Title
Environmental Assessment No. EA-02-20
Document Type
NOD - Notice of Determination
Received
Posted
12/20/2002
Present Land Use
Adjacent land use designations include: Public Facilities-California State University, Fresno, High, Medium-High and Medium-Low Density Residential, Neighborhood, Community and Office Commercial. Adjacent zone districts include: R-A, R-1-AH, R-1, R-2, R-3, R-4, R-P, C-P, C-1, C-2.
Document Description
Widening of one or two of the approaches at each intersection in order to improve traffic operations at each location. Other improvements include installation of curbs with wheelchair ramps, reconstruction of curbs, gutter and sidewalks to provide additional roadway width, relocation and/or modification of existing traffic signals, utility poles and streetlights, restriping in accordance with the modified geometrics, piping and backfilling existing Fresno Irrigation District canal, and relocation of existing storm drain inlets. Partial right-of-way acquisition along these modified intersection approaches will be necessary prior to construction of the proposed project.

Contact Information

Name
Scott Mozier, Professional Engineer
Agency Name
City of Fresno
Contact Types
Lead/Public Agency

Location

Cities
Fresno
Counties
Fresno
Cross Streets
East Shaw,East Barstow,East Herndon,East Bullard,North Willow,North Chestnut and North Cedar Ave
Parcel #
Varies
State Highways
168, 41
Airports
Fresno/Yosemite International
Township
13S
Range
20F,21
Base
MDB&M

Notice of Determination

Approving Agency
City of Fresno
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print