Vasco Road Safety Improvements
4 Documents in Project
Summary
SCH Number
2002102116
Lead Agency
Alameda County
Document Title
Vasco Road Safety Improvements
Document Type
NOD - Notice of Determination
Received
Posted
12/10/2002
Present Land Use
Zone D: Large Parcel Agriculture/ Resource Management Lands
Document Description
This project involves realigning about 1.3 miles of Vasco Road in unincorporated Alameda County north of Dalton Avenue (Livemore City Limit) and south of the Contra costa County line. The realigned section would be located westerly of the existing roadway between mile Posts 3.0 and 4.3 and would involve excavation of existing hillsides and filling of a portion of an existing swale. Existing underground high-pressure gas lines, overhead power transmission lines, and telephone lines on wood poles that conflict with the proposed improvements will be relocated prior to project construction. The realigned road right-of-way varies from approximately 18-22 meters (60 to 72 feet) in width. The typical roadway section would have two 3.6-m (12-foot) travel lanes with 2.4 m (8-foot) paved shoulders. In addition, a 3.6 m (12-foot) truck-climbing lane would be constructed on the uphill segments in both directions.
Contact Information
Name
Kwablah Attiogbe
Agency Name
Alameda County Public Works Agency
Contact Types
Lead/Public Agency
Phone
Location
Cities
Livermore
Counties
Alameda
Cross Streets
Dalton Avenue and Vasco Road
State Highways
I-580
Waterways
Unnamed
Notice of Determination
Approving Agency
County of Alameda
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.