Creek Enclosure Permit at 2002 Summit Drive

3 Documents in Project

Summary

SCH Number
2002102078
Lead Agency
City of Burlingame
Document Title
Creek Enclosure Permit at 2002 Summit Drive
Document Type
NOD - Notice of Determination
Received
Posted
1/13/2003
Present Land Use
Single Family Dwelling/Zoned R-1 (Single Family Residential)/Low Density Residential
Document Description
The applicant is requesting approval of a creek enclosure permit in order to extend an existing culvert for a distance of 82 feet. The applicant is proposing to fill a portion of the creek adjacent to the house and re-route the existing creek through a 30-inch culvert in order to have some useable yard area. The new extended culvert would tie directly into the existing 30-inch culvert downstream. By culverting the creek and filling over the pipe, the applicant would create a flat area so that his children could safely play outside without falling into the creek. The project consists of removing the unstable materials in the stream channel, removing the headwall for the existing culvert, installing a new reinforced concrete pipe for a length of 82 feet and installing a new headwall and riprap at the entrance of the new culvert. The new fill added over the culvert would be stabilized with riprap erosion control materials and landscaping.

Contact Information

Name
Margaret Monroe
Agency Name
City of Burlingame
Contact Types
Lead/Public Agency

Location

Cities
Burlingame
Counties
San Mateo
Cross Streets
Summit Drive/Easton Drive
Zip
94010
Total Acres
2.662
Parcel #
027-271-340
State Highways
280
Airports
San Francisco Int'l
Waterways
Easton Creek

Notice of Determination

Approving Agency
City of Burlingame
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print