Verizon California Coastal Development, Conditional Use and Special Permits

2 Documents in Project

Summary

SCH Number
2002102036
Lead Agency
Humboldt County
Document Title
Verizon California Coastal Development, Conditional Use and Special Permits
Document Type
NOD - Notice of Determination
Received
Posted
12/13/2002
Present Land Use
Rural Res. -5 acre min. parcel size (RR5). North Coast Area Plan (NCAP). Density: one unit per 5 acres.
Document Description
Coastal Development and Conditional Use Permits are required for the development of 57' tall lattice tower and three eight (8) foot diameter microwave dish antennas. They will be sited adjacent to the existing 49 foot tower and microwave relay facility operated by Verizon (formerly West Coast Telephone) as part of a common carrier fixed point-to-point microwave service. The new tower and microwave installation are necessary for system reliability and quality. The facility routes calls along an existing telecommunication network consisting of five towers relaying microwave signals between Eureka and Crescent City. This tower and the existing tower are for telephone service, not cellular or wireless communications. Verizon owns the 22,500 sf property on which this development is proposed. These two towers and their existing appurtenant equipment building will be enclosed within the existing 2,475 sf. fenced area secured by a locked gate and barbed wire. The proposed tower will not be lighted.

Contact Information

Name
Alyson Hunter
Agency Name
Humboldt County Community Development Services
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Hilton Road and US Hwy 101
Zip
95555
Total Acres
42
Parcel #
519-311-12
State Highways
101
Waterways
Redwood Creek, Freshwater Lagoon, Pacific Ocean
Township
10N
Range
1E
Base
HB&M
Other Location Info
City: Orick

Notice of Determination

Approving Agency
Humboldt County Planning Commission
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print