Corona Electrical Municipalization Project (CEMP)
3 Documents in Project
Summary
SCH Number
2002101157
Lead Agency
City of Corona
Document Title
Corona Electrical Municipalization Project (CEMP)
Document Type
NOD - Notice of Determination
Received
Posted
12/11/2002
Present Land Use
General Plan Designation for Chase Site and Corona Site are Park and General Industry, respectively. Zoning Designation for Chase Site and Corona Site are Open Space/Parks and General Manufacturing, respectively.
Document Description
The City of Corona is proposing to acquire and operate an electric utility system to distribute electricity to residential business, and industrial customers within its boundaries and in small portions of adjacent unincorporated Riverside County territory as authorized by California Constitution Article XI, Section 9(a).
Contact Information
Name
Mr. George Hansen, Deputy Director
Agency Name
City of Corona
Contact Types
Lead/Public Agency
Phone
Location
Cities
Corona
Counties
Riverside
Total Acres
1 per substation
Parcel #
120-020-001 and 119-230-008
State Highways
91
Airports
Corona Municipal Airport Railway
Township
4S
Range
7W
Other Information
Corona city limits and small pockets of adjacent unincorporated Riverside County territories known as the Coronitas (northwest of the City), Home Gardens (northeast of the City), and El Cerrito (southeast of the City) areas. Two proposed substations to be constructed include Chase Site, a parcel of land at the northwest corner of Santana Regional Park along Ontario Avenue, and Corona Site, located at Corporation Yard Way and Cota Street adjacent to the Temescal Desalter facility.
San Bernardino Meridian
Notice of Determination
Approving Agency
Corona City Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.