Port of Long Beach Gerald Desmond Bridge Replacement Project - HDP #04-086
10 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2002101141
- Lead Agency
- Long Beach, Port of (Port of Long Beach)
- Document Title
- Port of Long Beach Gerald Desmond Bridge Replacement Project - HDP #04-086
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/22/2011
- Present Land Use
- IP-Port Industrial
- Document Description
- The EIR Addendum addresses revisions to the Gerald Desmond Bridge Replacement Project, which was originally approved by the Long Beach Board of Harbor Commissioners on August 9, 2010. The approved by the Long beach Board of harbor Commissioners on August 9, 2010. The approved project consists of a new bridge to be located approximately 140 feet north of the existing Gerald Desmond Bridge, related roadway connections, interchange and ramp improvements, and the demolition of the existing Bridge. The project changes that are the subject of the Addendum are as follows: (1) the addition of a Class 1 bikeway, including a pedestrian walkway, that connects SR 47 to Pico Avenue; and (2) the modification of the noise control measures to provide equivalent noise control/minimization in connection with a change in the allowable working hours during construction of the project.
- Contact Information
-
Stacey Crouch
Port of Long Beach
925 Harbor Plaza
Long Beach, CA 90802
Phone : (562) 283-7100
Location
- Coordinates
- 33°45.6'"N 118°11.9'"W
- Cities
- Long Beach
- Counties
- Los Angeles
- Cross Streets
- Ocean Boulevard and Pico Avenue
- Zip
- 90802
- State Highways
- I-710
- Waterways
- Los Angeles River
Notice of Determination
- Approving Agency
- City of Long beach
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- The Port of Long Beach 925 Harbor Plaza Long Beach, CA 90802
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.